Starex Foldables GH

Home / How It Works
The process

From photo to fitted in about a week

Send a photo, we measure free, you get one price, we fabricate and fit. Here is exactly what happens at each step.

01

You send the space

A photo on WhatsApp is enough to start. Show us the wall, and if you can, stand back far enough that we can see the whole run. If you already know roughly how long it is, tell us — but do not worry if you do not.

Wall-mounted foldable drying line open across a tiled compound wall in Accra, amber lines strung between the arms
Six blue drying lines strung across a plastered wall from a black wall-mounted foldable arm
02

We measure

We come out and measure the span properly, because the span is what sets the price. While we are there we check the wall: solid blockwork, sound plaster, no cracks through the mounting area. Free across Greater Accra.

03

You get the quote

One number, covering fabrication, fittings and installation. No separate fitting charge, no delivery fee inside Accra. If the wall is not suitable, this is where we say so rather than take your money.

04

We fabricate

Cut, welded, galvanised and powder-coated in our workshop, to your span. Usually a few days depending on the queue.

05

We fit it

Bracket up, expansion bolts into the blockwork, arm on. Then we hang a full load of washing on it and pull on it before we leave. If it does not hold with us standing there, it does not hold.

Foldable drying line folded flat against a compound wall, arms upright and lines held close to the render
And after

We do not disappear

If a line needs re-tensioning, or you move house and want it taken down and refitted, message us. We built it, so we can service it.

Scroll to Top